EV Charging Stations in Nepal: Latest Updates and Charging Costs (2026)

Charging is the first question most people ask before buying an electric car in Nepal. The short answer is that the network has grown quickly, but the published numbers do not all measure the same thing. One count uses stations, another uses DC chargers and another uses individual charging guns. This guide collects the latest figures with their dates, explains who operates the stations, what NEA charges for electricity, and how to plan home and highway charging.

Key Takeaways

  • Kantipur reported on 17 October 2026 that Nepal has about 2,300 charging stations: 62 run by the Nepal Electricity Authority (NEA) and 2,238 by the private sector.
  • Meroauto reported 1,511 stations in July 2025, with 311 added in the previous fiscal year and about 1,200 before that.
  • NEA's EV tariff to stations is Rs 5.15 per unit off-peak (11 pm to 5 am), Rs 10.30 normal and Rs 11.70 at peak, with retail prices capped 20% above these.
  • Public maps list far fewer sites than the headline totals: NepalEVs showed 354 stations; the headline totals and the mapped sites are different counts.
  • Home charging with a Level 2 wallbox (7 to 22 kW) takes about 4 to 10 hours. A DC fast charger takes about 28 to 45 minutes for 30% to 80%.

How Many Charging Stations Does Nepal Have?

Different sources give very different totals, and the gap comes from what they count.

0 500 1,000 1,500 2,000 2,500 About 1,200 stations (Before FY 2024/25) About 1,200 Before FY 2024/25 1,511 stations (July 2025) 1,511 July 2025 About 2,300 stations (17 Oct 2026) About 2,300 17 Oct 2026

Reported charging stations in Nepal. Sources: Meroauto (18 July 2025) and Kantipur (17 October 2026).

View as table
DateReported stationsSource
Before FY 2024/25 (Meroauto: about 1,200 until the previous fiscal year)About 1,200Meroauto, 18 Jul 2025
July 20251,511Meroauto, 18 Jul 2025
17 Oct 2026About 2,300Kantipur
  • About 2,300 stations (October 2026): Kantipur's total, quoting NEA assistant manager Sagar Mani Gyawali. The article does not give a province split or say how many are fast chargers. The page is an AI-assisted translation from Nepali, so check the Nepali original for fine detail.
  • 1,511 stations (July 2025): Meroauto, citing the Ministry of Energy, Water Resources and Irrigation, which reported 311 added in the last fiscal year on top of about 1,200.
  • Around 1,050 DC chargers (April 2025): Meroauto quoted NEA saying about 1,050 DC chargers were operating, and described stations along major highways every 40 to 50 km. The same article says "over 1,000", so the exact figure is not settled.
  • 354 stations on a public map: NepalEVs listed 354 stations, 352 working, with 1,181 charging guns. The data date is not stated.

The practical reading is that thousands of charging points exist, but the number you can find on a map and rely on is smaller. Use a map or app to confirm that a specific charger is working before you depend on it.

Who Runs the Stations?

NEA: 62 public DC stations

NEA operates 62 stations according to Kantipur, Meroauto and Omoda Jaecoo Nepal. In September 2023 it switched on 51 rapid stations along highways, at bus parks and in major cities, including two at Dharke in Dhading, one each at the Chitwan, Muglin and Pokhara bus parks, and four in Kathmandu. Each has a 142 kW charger, a 50 kVA transformer and online billing, with 60 kW DC and 22 kW AC chargers so three vehicles, including a bus, can charge at once. The investment was about Rs 400 million, funded by NEA, an Asian Development Bank concessional loan and Norwegian technical assistance. Payment is by QR code or mobile app. In 2022 NEA also signed an agreement with Nepal Police to build stations at 25 police locations.

Car brands and private networks

Meroauto's April 2025 article lists operators of DC chargers: CG Motors with 290 DC chargers (260 GBT and 30 CCS-2 sites, from Panchthar in the east to Baitadi Bazaar in the west), MAW with CCS-2 chargers at 96 locations, and Tata Motors, BYD and Omoda/Jaecoo with about 30 DC stations each. The article says the operator figures do not add up to the total. Omoda Jaecoo Nepal's guide names ElectriVa with over 50 stations and chargers from 30 to 180 kW, and AirCharge with 16 or more high-speed stations and over 200 guns. A Techmandu list also names BYD, Hyundai, Tata, Kia, MG, Thee Digo, Yatri and ElectriVa, and warns that some sites may be out of service.

Where Are the Stations?

A study by NEA, reported by Republica, broke down where stations are located. The Republica article gives its date only as "May 21" with no year, and its total of 750 stations is older than the figures above, so treat the mix as a rough guide.

0% 10% 20% 30% 40% 50% Public areas Public areas: 41% 41% Hotels Hotels: 18% 18% Auto workshops Auto workshops: 17% 17% Restaurants Restaurants: 13% 13% Petrol pumps Petrol pumps: 8% 8% Other Other: 3% 3%

Share of stations by site type. Source: NEA study reported by Republica (undated).

View as table
Site typeShare of stations
Public areas41%
Hotels18%
Auto workshops17%
Restaurants13%
Petrol pumps8%
Other3%

Public areas lead at 41%, followed by hotels at 18% and auto workshops and garages at 17%. Petrol pumps hold only 8%. On highways, NEA plans stations every 60 km on the East-West Highway, Madan Bhandari Highway and Mid-Hill Highway, and a Rs 2 billion plan to add 500 stations has been reported. The reports do not give a completion date, so these are plans and not confirmed coverage.

What Does Charging Cost?

EV News Nepal, citing the Electricity Regulatory Commission tariff order and NEA, lists the rates below, checked on 14 October 2026. They are ceilings and the page does not give actual prices at each station.

NEA rate to stationRetail ceiling (20% markup) 0 4 8 12 16 Normal (5 am to 5 pm): Rs 10.3 10.30 Normal (5 am to 5 pm): Rs 12.36 12.36 Normal (5 am to 5 pm) Peak (5 pm to 11 pm): Rs 11.7 11.70 Peak (5 pm to 11 pm): Rs 14.04 14.04 Peak (5 pm to 11 pm) Off-peak (11 pm to 5 am): Rs 5.15 5.15 Off-peak (11 pm to 5 am): Rs 6.18 6.18 Off-peak (11 pm to 5 am)

NEA EV tariff to stations and the maximum retail price at a 20% markup. Source: EV News Nepal (checked 14 October 2026).

View as table
Time of dayNEA rate to station (Rs per unit)Retail ceiling (Rs per unit)
Normal (5 am to 5 pm)10.3012.36
Peak (5 pm to 11 pm)11.7014.04
Off-peak (11 pm to 5 am)5.156.18
  • Public charging: up to Rs 12.36 per unit at normal hours and Rs 14.04 at peak. Off-peak, the ceiling is Rs 6.18. Stations on a demand tariff pay Rs 220 per kVA per month plus Rs 8.90 per unit.
  • Home charging: the same page lists NEA home rates of Rs 9.50 per unit for 51 to 250 units a month and Rs 11.00 above 250 units.
  • Full charge: EV News Nepal estimates a 50 kWh car costs about Rs 522 to Rs 580 from the home wall and about Rs 680 at a public charger at the ceiling price.
  • Running cost: the page gives about Rs 1.78 per km for a car charged at home, against Rs 13.33 per km for a petrol car at 15 km per litre and Rs 200 per litre. The page's own inputs give about Rs 1.61 per km at home, so read the car figure as roughly Rs 1.6 to Rs 1.8.

Charging in the 11 pm to 5 am window cuts the unit price roughly in half, which matters if your station offers it. The figures are ceilings, so ask your station whether it offers an off-peak price.

Charger Types and Charging Time

  • Home socket: a portable cable plugs into a standard outlet, usually for overnight charging.
  • AC wallbox (Type 2, 7 to 22 kW): about 4 to 10 hours.
  • DC fast (CCS2, up to 130 kW or more): about 28 to 45 minutes for 30% to 80%.

NepalEVs counts 589 CCS2 guns, 508 GB/T guns and 84 AC guns. GB/T is the Chinese standard, so check which connector your car uses before relying on a network. Omoda Jaecoo Nepal estimates a home wallbox setup at about NPR 20,000, depending on wiring and property, and recommends a qualified electrician and a separate circuit.

Apps to Find a Charger

The apps named by Omoda Jaecoo Nepal are NEA Charge, NepalEVs, GadiCharge, ElectriVa and AirCharge (EI Charge). Use at least one map app and one operator app on any long trip.

Planning a Highway Trip

Corridors with charging noted in the guide include Kathmandu to Pokhara, Kathmandu to Chitwan and parts of the East-West Highway. A few habits help:

  • Leave with a full battery and plan stops before the battery gets low.
  • Check that each stop uses your connector type, CCS2 or GB/T.
  • Have a second charger in mind in case the first is out of service. Techmandu warns some listed stations may not work.
  • Carry the portable cable so you can use a normal socket at a hotel overnight.

What This Means for EV Buyers in Nepal

If you drive mainly in a city and can charge at home, the public network matters less. If you travel between cities, confirm that your route has chargers for your connector and check which operator networks need their own app. Compare range and charging details for each model on GoWithEVs.

FAQs

How many EV charging stations are there in Nepal?

Kantipur reported about 2,300 on 17 October 2026, including 62 run by NEA. Earlier, Meroauto reported 1,511 in July 2025. Map listings show fewer, for example 354 on NepalEVs.

How much does it cost to charge an EV in Nepal?

NEA sells electricity to stations at Rs 5.15 to Rs 11.70 per unit depending on time of day, and retail prices are capped 20% above that, at Rs 6.18 to Rs 14.04.

How long does DC fast charging take?

About 28 to 45 minutes for 30% to 80%, according to Omoda Jaecoo Nepal's guide.

Which connector types are used in Nepal?

CCS2 and GB/T for DC charging, and Type 2 for AC. Check which one your car has.

Can I charge at home?

Yes. A portable cable works with a household socket, and a Level 2 wallbox of 7 to 22 kW charges faster.